Obtaining a Connection

Obtaining a hitch-free connection.

Go to your sales point or agency with your complete file or complete the form online

Documents to be provided:

Connection / Subscription
o Site plan
o Customer’s ID
o Request for connection/subscription (Form to be completed at sales point/agency or online)

Subscription on existing connection
o Hand drawn site plan
o Customer’s ID
o Lease contract registered at the tax office in case of outstanding bills vis-à-vis the installation
o Request for connection/subscription (Form to be completed at sales point/agency or online)

Service regulations
• Period of time to establish a connection estimate is 05 days and the validity of the connection estimate is 90 days as from the date of issue
• Execution timeframe for Low Voltage connection is:

o 05 working days for urban areas
o 15 working days for rural areas

• Timeframe for the installation of meters on existing connections following payment of consumption deposits is:

o 03 working days for urban areas
o 05 working days for rural areas


Concerning underground connections, timeframes are negotiated on a case by case basis.
NB: The validity of the connection estimate is 90 days as from the date of issue

Price schedule or list for a Low Voltage connection (Excluding Tax) :

CONNECTION TYPE COST (FCFA)
Low Cost Supplementary Meter Board (Single Phase) 20.350
First Class (A and B) Supplementary Meter Board (Single Phase) 27.279
Low Cost Installation (Single Phase) 29.559
Second Class (A and B) Supplementary Meter Board (Three phase) 42.309
First class (A and B) Installation (Single Phase) 47.934
Second Class (A and B) Installation (Three phase) 88.973

 

NB: The total cost of connection may vary depending on the distance between the network and the supply point (additional cable and pole)

Cost of low cost connection :

  Former cost New cost
Subscription 5 A 9.000 FCFA HT 5.300 FCFA HT
Subscription 10 A 19.565 FCFA HT 9.290 FCFA HT

 NB: Connection and subscription requests are already operational via the online agency: MyEasyLight

Cost of connection (Single Phase) :

Type of subscription Installed load Amperage (A) Amount of Consumption Deposits (FCFA)
SINGLE PHASE (2 Fils) 0.66 3 5 300
1.1 5 5 300
2.2 10 9 290
3.3 15 29 840
4.4 20 40 110
5.5 25 50 385
6.6 30 60 655
7.7 35 70 930
8.8 40 81 200
9.9 45 91 475
11 50 102 680
12.1 55 112 020
13.2 60 122 295

 

Cost of connection (Tree Phase) :

Type of subscription Installed load Amperage (A) Amount of Consumption Deposits ( FCFA)




TREE PHASE ( 4 Fils)




3.3 5 29 840
6.6 10 60 655
9.9 15 91 475
13.2 20 122 295
16.5 25 153 110
19.8 30 183 930
26.4 40 245 565
33 50 307 205
39.6 60 368 840
46.2 70 430 475
49.5 75 461 295
52.8 80 492 115
59.4 90 553 750
66 100 615 385
82.5 125 769 480

 

Indicative cost (Excluding tax) for distribution facilities :

FACILITIES COST (Excluding Tax)
Single phase Medium Voltage line 7.500.000 FCFA/KM
Wood three phase Medium Voltage line 15.000.000 FCFA/KM
Metal overhead three phase Medium Voltage line 20.000.000 FCFA/KM
Underground three phase Medium Voltage line 40.000.000 FCFA/KM
Distribution substation type H 61 5.000.000 FCFA
Distribution substation Single Phase  3.000.000 FCFA
Cabin distribution substation (supply) 30.000.000 FCFA
Medium Voltage delivery station 55.000.000 FCFA
Pole Mounted Recloser (Disjoncteur HTA) 15.000.000 FCFA

 

NB : A detailed estimate is established after our experts have gone to the field.

NB : A connection estimate is valid for 90 days as from its date of issue.


image
APPLICATION TRACKING

Evolution and e-Quotation

image
ELECTRONIC INVOICE

Last 12 months Emails & Alerts

image
COMPLAINTS ONLINE

Live tracking and revival

image
INCIDENTS & WORK SCHEDULE

Calendar by city and quarter