Your browser needs to be updated to take advantage of all the features of the Cameroon Eneo website.

Firefox, Internet Explorer, Chrome, Safari

« I am very comfortable to announce how confident I am about the future of our company », the Coach proudly indicated.

Read more

"To all, I repeat my call: Let's be proud to belong to Eneo!" ... JNK, on ​​the occasion of the 31st edition of the International Labor Day.

Read more

The Limbe Thermal Power Plant was commissioned in 2004 with an installed capacity of 85MW i.e. 17MW for each of the five (05) Wartsila 18V46 Gensets

Read more

The Kribi deep water port is connected to the Eneo power grid. The deep water port of Kribi is now drawing its energy from the South interconnected network. 

Read more

Georges Samuel Njoh Njoh, the Limbe Thermal Power Plant Manager, is proud with what has been done in Limbe, at the end of a refurbishment operation that lasted for close to six months.

Read more
CHAN 2020-CAN 2021: Most of the power supply installations for the sites have been built and operational

Yaounde, 24 January 2020- Eneo has already built and commissioned more than 90% of the installations

Insights on the financial health of Cameroon’s power system in early 2020

Electricity rationing, inputs from the Memve’ele and Lom Pangar dams on energy supply, government

"The sun rises in the East" : After Djoum, Eneo Cameroon commissions its second hybrid solar-thermal power plant in Lomié

Lomié, July 29, 2020. Eneo Cameroon announces the commissioning on 27 July, in Lomié, Eastern Regi


image
APPLICATION TRACKING

Evolution and e-Quotation

image
ELECTRONIC INVOICE

Last 12 months Emails & Alerts

image
COMPLAINTS ONLINE

Live tracking and revival

image
INCIDENTS & WORK SCHEDULE

Calendar by city and quarter