Regulatory turnaround time for Eneo services

The turnaround times are set by the service regulator if a connection is executed after the regulatory turnaround time, the customer has the right to demand compensation from his agency.

Below is the regulatory turnaround time for each Eneo services :

1. Turnaround time for a new connection request:
     A. For urban area
                Estimate: 5 days
                Installation of connection: 5 days

     B. In rural area :
               Estimate: 5 days
               Installation of connection: 15 days

2. Turnaround time for a subscription on an existing connection:
      A. For urban area: 3 days
      B. In rural area : 5 days

3. Turnaround time for a network (re)configuration: 
      A. For urban area: 30 days
      B. In rural area : 60 days

Read more : http://arsel-cm.org/photo/reglement_electricite.pdf