Your browser needs to be updated to take advantage of all the features of the Cameroon Eneo website.

Firefox, Internet Explorer, Chrome, Safari

Improving the Stability of Electricity Supply

In a bid to improve electricity supply, Eneo Cameroon S.A announces to its customers that it will  

on Saturday 17 and Sunday 18 June 2017, carry out on some major work on the transmission system. These curative and preventive maintenance operations will disrupt electricity supply in the neighbourhoods and localities concerned.

Region/
Communities
Facilities
Work Envisaged Benefits Localities affected Time
Yaoundé Oyomabang transformer substation

Restoration of the link between the Oyamabang plant and Oyomabang transformer substation

Availability of more energy from the Oyomabang plant (x MW) to supply customers 

Afeme Nord-Awae Maison Rouge-Clinique Afana-Ekozok-Leboudi-Nkolanga-Nkongoua-Nkomekoui-Petit terrain Oyomabang-Zamengoué 06h-14h
Yaoundé Nsimalen Transformer substation 

Preventive maintenance on operation equipment

Reduction of risks of incidents

Aeroport de Nsimalen-Ekoko-Ingenierie Forestière-Messamendongo- Mfou Ville-Mimetala-Minkan-Ngalan- Nkolda-Nsimalen Village- Odza 06h-14h
North and Far North  Garoua Transformer substation 

Servicing of equipment    

Stabilization of energy supply 

Guider and Far North  08h-17h
North West Bafoussam–Bamenda transmission line and  Bamenda Transformer substation 

Replacement of faulty parts

Reduction of risks of incidents on these facilities         

North West Region 06h-16h


During the work, measures will be taken to minimize the duration of the blackout and the number of customers without power. Eneo advises those affected to use other sources of energy if necessary, as well as to unplug all sensitive appliances and to reconnect them at least 15 minutes after the effective restoration of power.

Eneo also announces that regarding the reinforcement of its distribution network, some minor projects (Replacement of wood poles or transformers; Changing of cables, etc…) will be carried out in some neighbourhoods and localities. If you wish to know if your locality is concerned with such projects, please visit Works & Cuts

For further details and our electricity safety and saving tips, visit our website:  www.eneocameroon.cm, or call our Customer Service Centre on 8010.

 Intégralité du communiqué (PDF)

 

A step furthermore in the dynamics of strengthening of the energy offer in Cameroon

The english version of this text will be soon available.L’Etat du Cameroun; EDF; IFC Banque mondia

Communication of the Managing Director of Eneo Cameroon S.A at the IPAD conference

.The english version of this text will be soon available.Joël Nana Kontchou face à une centaine de

Emergency works further to an incident on the transport line Bekoko-Nkongsamba-Bamenda

Eneo Cameroon informs its customers in the West and North-West Regions that an incident occurred on

Transport line Bekoko-Nkongsamba: acceleration of the works for a return to normal on Wenesday, January 13th at the latest

Following the incident that occurred on Monday 11 January 2015 on the  90 KV Bekoko- Nkongsamba-Bam


image
APPLICATION TRACKING

Evolution and e-Quotation

image
ELECTRONIC INVOICE

Last 12 months Emails & Alerts

image
COMPLAINTS ONLINE

Live tracking and revival

image
INCIDENTS & WORK SCHEDULE

Calendar by city and quarter

ENEO ALERTS

Receive our real-time alerts

(Invoices, payment reminder, works and outage...)

 

STAY CONNECTED

Find Eneo on social networks

MOBILES APPLICATIONS

Smartphones & Tablets