Your browser needs to be updated to take advantage of all the features of the Cameroon Eneo website.

Firefox, Internet Explorer, Chrome, Safari

Major maintenance work on the North West and West network this Sunday, 24 April

Eneo Cameroon announces to its North West customers that this Sunday, 24 April 2016, from 6:30 AM   to 5:30 PM, some major work will take place on the transmission network serving them.

This maintenance work concerns the Bafoussam transformer substation and the Nkongsamba-Bafoussam-Bamenda transmission line. The substation work involves reinforcing the operation equipment. The transmission line work involves:

  • Repairing damaged conductors
  • Replacing broken isolators
  • Removing bird nests
  • Felling trees that obstruct the corridors 

This work will help to improve the availability and reliability of the power system and reduce the risks of incidents that might cause power failure of long durations in these regions.

While this work is in progress, Eneo, for safety reasons, shall interrupt power supply to the North West and West regions.

Eneo Cameroon strongly advices its customers to disconnect their sensitive appliances throughout the duration of the work and to reconnect them at least 15 minutes after the effective restoration of power.

For more details on our safety and energy saving tips, visit the website www.eneocameroon.cm or call 8010

A step furthermore in the dynamics of strengthening of the energy offer in Cameroon

The english version of this text will be soon available.L’Etat du Cameroun; EDF; IFC Banque mondia

Communication of the Managing Director of Eneo Cameroon S.A at the IPAD conference

.The english version of this text will be soon available.Joël Nana Kontchou face à une centaine de

Emergency works further to an incident on the transport line Bekoko-Nkongsamba-Bamenda

Eneo Cameroon informs its customers in the West and North-West Regions that an incident occurred on

Transport line Bekoko-Nkongsamba: acceleration of the works for a return to normal on Wenesday, January 13th at the latest

Following the incident that occurred on Monday 11 January 2015 on the  90 KV Bekoko- Nkongsamba-Bam


image
APPLICATION TRACKING

Evolution and e-Quotation

image
ELECTRONIC INVOICE

Last 12 months Emails & Alerts

image
COMPLAINTS ONLINE

Live tracking and revival

image
INCIDENTS & WORK SCHEDULE

Calendar by city and quarter

STAY CONNECTED

Find Eneo on social networks

MOBILES APPLICATIONS

Smartphones & Tablets